ICU Maintenance Notice 3/5/2024
Valued Internet Café USA Client,
As part of our ongoing facility infrastructure improvements, we are notifying you about at-risk maintenance taking place in our Orlando-based facility next week.
As part of our ongoing facility infrastructure improvements, we are notifying you about at-risk maintenance taking place in our Orlando-based facility next week.
We will be upgrading and replacing the UPS systems for our A-side power path within our Orlando (MCO2) data center facility. This upgrade will improve the capacity and reliability of the power delivery for this power path. We do not anticipate any issues during this maintenance and will be taking adequate precautions to mitigate and minimize the risk of impacting client services. No action is required on your part before the scheduled maintenance and we do not anticipate service disruption during the upgrade. For the duration of the maintenance, services supplied by the A-side power path will be continuously supplied power from our A-side standby power systems to minimize the risk of power fluctuations or loss of power from the utility services during this time.
Services, such as our VPS and Cloud platforms or any other service specifically configured to use both, which are backed by A|B redundant power supplies are fed from both our A-side and B-side power paths and would not be perceived to be potentially service-affecting during the maintenance. The maintenance will be completed during the maintenance window starting on March 13th at 8:00 am through March 14th at 8:00 pm.
Maintenance Type:
Planned - PSA (Potentially Service Affecting) Uninterruptible Power Supply (UPS1) Replacement & Upgrade
Reason for Maintenance:
Replacement and upgrade of UPS systems for A-side power path
Maintenance Window:
Planned Start: March 13, 2024 @ 05:00AM PST
Planned End: March 14, 2024 @ 05:00PM PST
Estimated Duration: 36 hours
Clients Affected:
All Internet Café USA Clients may be impacted.
Data Center
MCO2 (Orlando, Florida DC2)
Estimated Amount of Downtime:
Potential downtime is highly unlikely.
While we do not foresee any changes to this scheduled maintenance at this time, should the maintenance schedule change we will send a follow-up maintenance change notification with details on the amended scheduling. If you have any other questions or concerns please feel free to reply to this notice and we will gladly assist you further.
Our team will be performing additional testing and validation of the upgraded UPS system before transferring the load back onto the infrastructure. For this reason, we will be extending the scheduled maintenance window for the UPS upgrade for at least an additional 48 hours and will provide future updates as needed.
Thank you so much for taking the time to review this notice. If you have any questions or concerns about this procedure, please let us know.